Talk to us on 02 9792 1533

Snowy River Shire Council

Installation Date:

November 2011

Scope of Supply:

Turnkey including design, project management and commission

New or Upgrade:

Existing weighbridge - new traffic controls and software

Installation Configuration:

 

 

 

 

  • TipSite Manager Software – fully configured
  • Dual direction single weighbridge configuration
  • Heavy duty dual height Card readers on the entry
  • Assistance button to allert staff there is a customer on the weighbridge
  • CSV export module
  • Heavy duty camera traffic light bollard on the entry
  • Light duty dual height card reader on the exit
  • 2 heavy duty boomgates
  • 1 overhead camera
  • Heavy duty swing mounted camera pole for ease of use for cleaning/servicing of camera.
  • Direct exit card reader

this is defined in inc/superfooter.asp
Site Content © 2010 TipSite Systems Pty Ltd
Site Design © 2010 Stralia Web